What Is Statistical Process Control (SPC)?

Definition

Statistical Process Control (SPC) is a method of monitoring a process using statistics, mainly control charts, to tell normal variation from unusual changes so problems can be corrected before bad parts are made.

SPC in Simple Terms

Every process varies a little. SPC separates common cause variation, which is the normal noise of a stable process, from special cause variation, which signals that something has changed, such as tool wear, a new material batch or a wrong setting.

The method was developed by Walter Shewhart in the 1920s and is one of the IATF 16949 core tools, described in the AIAG SPC manual.

How It Works

  1. Choose the characteristic to monitor, often a special characteristic.
  2. Collect samples at a set frequency, such as five parts every hour.
  3. Plot them on a control chart, for example an X-bar and R chart.
  4. Calculate control limits from the process data, not from the tolerance.
  5. React to points outside the limits or patterns flagged by run rules.
  6. Once the process is stable, measure capability with Cp and Cpk.

Example

A grinding line checks the outer diameter of five bearing races every 30 minutes. One afternoon the X-bar chart shows eight points in a row above the centre line, though all parts are in tolerance. The operator finds the coolant temperature has risen, corrects it, and the chart returns to its normal pattern.

Why It Matters

  • Problems are caught while parts are still good, which cuts scrap.
  • Operators know when to adjust and when to leave the process alone.
  • Capability data supports PPAP and customer reviews.

OperaHive SPC software provides X-bar, R, S and I-MR charts, alert rules and capability studies. Read the SPC and Cpk guide for more.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What is SPC?

SPC, or statistical process control, uses statistics and control charts to monitor a process in real time and tell normal variation apart from special causes that need action.

What does SPC stand for?

SPC stands for statistical process control. It is one of the AIAG core tools used in automotive manufacturing.

What is the difference between control limits and specification limits?

Control limits come from the process data and show how it normally behaves. Specification limits come from the drawing and show what the customer will accept.

Is SPC required by IATF 16949?

IATF 16949 expects statistical tools to be used where appropriate, and SPC is one of the core tools most automotive customers require for special characteristics.

What are the types of SPC control charts?

Variable charts include X-bar and R, X-bar and S, and individuals and moving range. Attribute charts include p, np, c and u charts.

How do you calculate control limits in SPC?

For an X-bar chart, the control limits are the grand average plus and minus A2 times the average range. In general, limits sit about 3 standard deviations from the centre line.

What is common cause vs special cause variation?

Common cause variation is the natural, random noise of a stable process. Special cause variation comes from a specific event, such as a worn tool or new material batch, and should be investigated.

What is an SPC example?

An operator measures five shafts every hour and plots the average and range on an X-bar and R chart. When seven points run above the centre line, the operator checks the tool offset before parts go out of tolerance.

What is the difference between SPC and process capability?

SPC monitors whether a process is stable over time. Process capability, such as Cpk, measures how well a stable process fits within the specification limits.

What are the benefits of SPC?

SPC detects process changes before they create defects, reduces inspection and scrap, and gives evidence of stability and capability to customers.

What is SPC software?

SPC software collects measurements, plots control charts, applies run rules and calculates capability automatically, often taking data directly from gauges.

Put It Into Practice

Book a demo and see how OperaHive handles this on your own parts, processes and documents.