X-bar and R Chart in Simple Terms
Every so often an operator measures a small group of consecutive parts, usually 3 to 5. The average goes on the top chart and the range (largest minus smallest) goes on the bottom chart. It is one of the most widely used charts in SPC.
Use it when you have variable data and subgroups of up to about 8 to 10. For larger subgroups an X-bar and S chart is preferred, and for single readings an I-MR chart.
How to Calculate It
- Collect at least 20 to 25 subgroups of the same size n.
- Work out each subgroup average (X-bar) and range (R).
- Average them to get X-double-bar and R-bar, the centre lines.
- Calculate the control limits: X-bar chart limits are X-double-bar plus or minus A2 x R-bar; R chart limits are D3 x R-bar and D4 x R-bar.
- Plot new subgroups and react to signals.
Example
A turning cell measures 5 shafts every hour. The R chart stays steady, but the X-bar chart shows seven points in a row above the centre line. The spread has not changed, but the average has moved, which points to tool wear or an offset rather than a loose fixture. The operator adjusts the offset and the points return to the centre.
Common Mistakes
- Reading the X-bar chart while the R chart is out of control; check the R chart first.
- Mixing parts from different machines or cavities in one subgroup.
- Using specification limits instead of calculated control limits.
The OperaHive SPC software provides X-bar, R, S and I-MR charts with alert rules. Our SPC and Cpk guide covers the topic in more depth.