For aerospace suppliers and MROs

Aerospace Quality Management System Know exactly what was approved, for every part revision.

Run AS9145 launches and first article inspections, control engineering changes and keep a clean record of every approval, in the cloud or on your own servers.

Why it matters

What does aerospace quality management software need to do?

It must prove that every delivered part matches an approved design at a known revision. That means first article inspection under AS9102, AS9145 launch planning, controlled engineering changes, and records that show who approved what and when, all traceable for years after delivery.

Aerospace quality teams spend a lot of time proving things they already did. The FAI exists, but it was for the previous revision. The change was approved, but nobody can find the signature. Traceability that lives in folders breaks down fast.

What you get

What aerospace quality teams get

First article inspection

Full and partial FAIs with ballooned characteristics, measured results and approval records per revision.

AS9145 launch phases

Plan new parts through the aerospace APQP phases with gates and deliverables.

Configuration changes

Engineering changes record the parts and documents they affect, with impact and approvals, so you can plan partial FAIs.

Document control

One released revision of every drawing and work instruction, with review dates and access by role.

Supplier quality

Collect supplier first articles and approvals through a portal, and track findings to closure.

Cloud or on-premise

Run it in our cloud or inside your own network when a programme requires it.

Standards and industries

Aerospace standards we support

IndustryStandardWhat you get
AerospaceAS9100DQuality system records, configuration management, risk and supplier control
AerospaceAS9145APQP phases and production part approval for aerospace
AerospaceAS9102First article inspection, full and partial, per revision
Aero enginesAS13100Supplier quality requirements for engine programmes
FAQ

Aerospace quality questions

Still unsure? Ask our team.

What is AS9102 first article inspection?

AS9102 sets out how to record a first article inspection: a full check that the first production part matches every requirement on the drawing. A partial FAI repeats the check only for the characteristics affected by a change.

When does a part need a new FAI?

Usually after a design change that affects fit, form or function, a change of manufacturing source, site or process, or a long break in production. YourBrand records which parts a change affects so you can plan the FAI.

Do you support AS9145 APQP?

Yes. The APQP product includes the aerospace phases and deliverables, and links to the approval package at the end of the launch.

Can we host it ourselves?

Yes. YourBrand runs in our cloud or on your own servers with the same features.

Does it work for MRO shops?

Document control, inspections, gauges and supplier quality work well for repair and overhaul shops. Talk to us about your specific workflow.

See it with one of your own part numbers

We walk through it with your own parts and documents. It takes about 30 minutes.