Definition

Cp and Cpk are process capability indices that compare the spread of a stable process with its specification limits. Cp measures potential capability; Cpk also accounts for how well the process is centred.

Cp and Cpk in Simple Terms

Cp asks: would the process fit inside the tolerance if it were perfectly centred? Cpk asks: does it fit, given where it actually runs? If Cp is good but Cpk is low, the process is capable but off-centre, which is usually easier to fix than too much variation.

Both use within-subgroup (short-term) variation and assume the process is stable, which is shown on a control chart.

How It Works

  • Cp = (USL minus LSL) divided by 6 sigma.
  • Cpk = the smaller of (USL minus mean) and (mean minus LSL), divided by 3 sigma.
CpkTypical interpretation
Below 1.0Not capable, parts outside tolerance are likely
1.0 to 1.33Marginal, needs close control
1.33 or moreCommon target for ongoing production
1.67 or moreCommon target for special characteristics and launch

Targets come from the customer. AIAG PPAP uses 1.67 for initial studies of special characteristics.

Example

A shaft has a tolerance of 20.00 plus or minus 0.06 mm. The process sigma is 0.01 mm, so Cp is 0.12 divided by 0.06, which is 2.0. The mean is 20.03, so Cpk is (20.06 minus 20.03) divided by 0.03, which is 1.0. Re-centring the tool offset to 20.00 raises Cpk to 2.0 without any other change.

Common Mistakes

  • Calculating Cpk on an unstable process.
  • Ignoring non-normal data.
  • Using too few parts; 100 or more readings in 25 subgroups is a common minimum.
  • Confusing Cpk with Ppk, which uses overall variation.

The OperaHive SPC software runs Cp/Cpk studies from shop-floor data. The SPC and Cpk guide covers the method in depth.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What is a good Cpk value?

Many customers require 1.33 or more for ongoing production and 1.67 or more for special characteristics or initial studies. Always check your customer requirements.

What is the difference between Cpk and Ppk?

Cpk uses short-term, within-subgroup variation and shows what the process can do. Ppk uses overall variation and shows what it actually delivered over the study period.

Can Cpk be higher than Cp?

No. Cpk equals Cp when the process is perfectly centred and is lower otherwise.

What is Cp and Cpk?

Cp and Cpk are process capability indices. Cp compares the specification width with the process spread. Cpk also accounts for where the process is centred, so it reflects how close the output runs to the nearest limit.

How do you calculate Cpk?

Cpk is the smaller of (USL minus mean) divided by 3 sigma and (mean minus LSL) divided by 3 sigma, where sigma is the within-subgroup standard deviation.

How do you calculate Cp?

Cp equals the upper specification limit minus the lower specification limit, divided by six times the process standard deviation. It ignores centring and shows potential capability only.

Cp vs Cpk: what is the difference?

Cp shows whether the process spread could fit inside the tolerance. Cpk shows whether it actually does, given where the process is centred. A large gap between them means the process is off centre.

What does a Cpk of 1.33 mean?

A Cpk of 1.33 means the nearest specification limit is four standard deviations from the process mean. For a normal, stable process that equals roughly 63 defective parts per million.

What is a Cpk example?

A shaft has a tolerance of 10 plus or minus 0.06 mm, a mean of 10.02 mm and a sigma of 0.01 mm. Cpk is (10.06 minus 10.02) divided by 0.03, giving 1.33.

What are the requirements for a valid Cpk study?

The process must be stable, shown on a control chart, and the data roughly normal. Use a capable measurement system and enough data, commonly 25 subgroups or at least 100 readings.

How can I improve Cpk?

First centre the process on the nominal value, which raises Cpk toward Cp. Then reduce variation by finding and removing its main sources, such as tooling, fixtures, material and method.

Put Cp and Cpk Into Practice

Book a demo and see how OperaHive handles this on your own parts, processes and documents.