SPC and Cpk Guide for Manufacturers

How control charts separate real process changes from normal variation, and how Cp, Cpk, Pp and Ppk show whether your process fits the tolerance.

Updated 17 November 2026 · By the OperaHive team

Statistical Process Control (SPC) is a way of watching a process with data so you can see when it changes, and react before it makes bad parts. Process capability, usually reported as Cpk, tells you how well a stable process fits inside the tolerance.

Both are core tools in automotive quality and are widely used in aerospace and general manufacturing. This guide covers the basics you need to set them up and read them correctly.

What is SPC?

Every process varies. Some variation is normal, the result of many small causes that are always present. This is called common cause variation. Other variation comes from a specific change, such as a worn tool, a new batch of material or a wrong setting. This is called special cause variation.

SPC uses control charts to tell the two apart. When the chart shows only common cause variation, the process is stable and the operator should leave it alone. When it signals a special cause, the operator should find and fix the cause.

Choosing a control chart

The right chart depends on the type of data and how it is collected.

ChartData typeUse when
X-bar and RVariable (measured)Small subgroups, typically 2 to 9 parts at a time
X-bar and SVariable (measured)Larger subgroups, typically 10 or more parts
Individuals and moving range (I-MR)Variable (measured)One measurement at a time, such as batch processes or slow cycles
p and npAttribute (pass or fail)Proportion or count of defective parts
c and uAttribute (count of defects)Number of defects per part or per unit

Control limits are not specification limits

Control limits are calculated from the process data, usually at three standard deviations either side of the average. They describe what the process actually does.

Specification limits come from the drawing. They describe what the customer needs. A process can be in control and still make parts out of specification, or be out of control while every part is still in tolerance. Never draw the specification limits as control limits.

Once the limits are calculated from a stable period, approve and lock them. Recalculating every time new data comes in hides the very changes SPC is meant to catch.

Run rules: when to react

A point outside the control limits is the most obvious signal, but not the only one. Common run rules, often called the Western Electric or Nelson rules, include:

  • One point beyond three sigma.
  • Two out of three points beyond two sigma on the same side.
  • Four out of five points beyond one sigma on the same side.
  • Eight or more points in a row on one side of the centre line.
  • Six points in a row steadily increasing or decreasing.

Each signal should lead to a recorded reaction: what was found, what was done and whether the parts made since the last good check need to be contained.

Cp, Cpk, Pp and Ppk explained

Capability indices compare the spread of the process with the width of the tolerance.

  • Cp compares the tolerance width with the process spread (six standard deviations). It ignores where the process is centred.
  • Cpk takes the centring into account. It is the smaller of (upper limit minus mean) and (mean minus lower limit), divided by three standard deviations.
  • Pp and Ppk use the same formulas with the overall standard deviation of all the data, instead of the short-term variation within subgroups.

Cp and Cpk show what the process could do in the short term. Pp and Ppk show what it actually delivered over the study period. A large gap between Cpk and Ppk usually means the process shifts between subgroups.

Capability only means something for a stable process. Check the control chart first: if it is out of control, the capability number does not predict the future.

Typical capability targets

Index valueWhat it usually means
Below 1.00The process makes parts outside the tolerance. Containment and improvement are needed.
1.00 to 1.33Marginal. The process just fits and needs close control.
1.33 or aboveA common target for ongoing production.
1.67 or aboveA common target for initial studies and special characteristics, for example in PPAP.

These are common automotive targets. Your customer's requirements always take priority.

Making SPC work on the shop floor

  • Chart the characteristics that matter: special characteristics and those linked to known failures.
  • Make sure the gauge has passed MSA before trusting the chart.
  • Let operators enter results at the machine and see signals straight away.
  • Define the reaction plan for each signal in the control plan.
  • Review capability regularly and act when it drops.

OperaHive SPC software puts control charts at the machine, applies run rules as data is entered, uses approved control limits and calculates Cp, Cpk, Pp and Ppk for every characteristic.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What is the difference between Cpk and Ppk?

Cpk uses the short-term variation within subgroups and shows what the process can do. Ppk uses the overall variation of all data and shows what the process actually delivered. If Ppk is much lower than Cpk, the process is shifting over time.

What is a good Cpk value?

A Cpk of 1.33 or above is a common target for ongoing production. Many automotive customers ask for 1.67 or above for initial studies and special characteristics. Always check your customer requirements.

What is the difference between control limits and specification limits?

Control limits are calculated from process data and show what the process actually does. Specification limits come from the drawing and show what the customer needs. They should never be mixed up on a control chart.

How many samples do I need for a capability study?

A common practice is at least 25 subgroups, or about 100 individual measurements, collected over a period that includes normal process changes such as shifts and material batches. Your customer may set a specific number.

Which control chart should I use?

It depends on the data:

  • X-bar and R for small subgroups of measured data.
  • X-bar and S for larger subgroups.
  • I-MR for one measurement at a time.
  • p, np, c or u charts for pass or fail and defect counts.

Put SPC at the Machine, Not in a Spreadsheet

Book a demo and see control charts, run rules and Cpk studies working on your own characteristics.