PFMEA in Simple Terms
A PFMEA takes each step of the process flow diagram and asks what could go wrong there. For every failure mode the team rates severity, occurrence and detection, then plans actions to lower the risk before production starts.
It is the process half of FMEA. The DFMEA covers the design, while the PFMEA assumes the design is correct and looks at how the part is made.
How It Works
The AIAG-VDA FMEA Handbook (2019) sets out seven steps: 1. Planning and preparation: scope, team and timing. 2. Structure analysis: process items, steps and work elements. 3. Function analysis: what each step must achieve. 4. Failure analysis: failure effects, modes and causes. 5. Risk analysis: prevention and detection controls, ratings and Action Priority. 6. Optimisation: actions to reduce risk. 7. Results documentation: record and communicate the outcome.
Older PFMEAs ranked risk with the risk priority number. The controls agreed in the PFMEA flow into the control plan.
Example
At a press-fit station for a bearing, the PFMEA lists "bearing not fully seated" as a failure mode, caused by low press force. Severity is high because the bearing could work loose in service. The team adds force and distance monitoring with automatic rejection, which lowers the detection rating and moves the action priority from high to low.
Why It Matters
- Process risks are found before tooling is built and parts are shipped.
- Controls on the line have a clear reason behind them.
- It is a required PPAP element and a core tool under IATF 16949.
OperaHive FMEA software generates the control plan from the released PFMEA. For more detail, read the FMEA guide.