What Is Action Priority (AP)?

Definition

Action Priority (AP) is the method used in the AIAG-VDA FMEA Handbook to decide how urgently a risk needs action. It rates each failure as High, Medium or Low based on the combination of severity, occurrence and detection.

Action Priority in Simple Terms

For years teams ranked FMEA risks with the Risk Priority Number, which multiplies severity, occurrence and detection. The 2019 AIAG-VDA handbook replaced RPN with AP tables. Instead of a single product, AP looks up the actual combination of the three ratings, giving the most weight to severity, then occurrence, then detection.

How It Works

AP ratingWhat the team must do
HighIdentify an action to improve prevention or detection controls, or justify why current controls are adequate
MediumShould identify an action, or justify why current controls are adequate
LowCould identify an action to improve controls

AP is used in both DFMEA and PFMEA. The handbook states that AP is not a ranking of risks against each other. It is a priority for taking action.

Example

A PFMEA line for a brake hose crimp has severity 9, occurrence 4 and detection 7. Its RPN would be 252, which some teams might have ignored under a threshold of 300. The AP table rates this combination High, so the team adds an in-line crimp force monitor and updates the control plan.

AP vs RPN

  • RPN treats the three ratings as equal, so a severity 10 risk can score lower than a nuisance risk.
  • AP puts severity first, so serious failures cannot hide behind good detection.
  • RPN thresholds were often misused as targets. AP removes the single number.

The OperaHive FMEA software calculates Action Priority using the AIAG-VDA method and tracks the resulting actions. See the FMEA guide for the full method.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

Did Action Priority replace RPN?

In the AIAG-VDA FMEA Handbook, yes. Some customers and older FMEAs still use RPN, so check your customer-specific requirements.

Does a High AP always require an action?

The team must either take action to improve controls or document why the current controls are adequate. Many customers expect High items to be reviewed by management.

What is Action Priority in FMEA?

Action Priority, or AP, is the method in the AIAG-VDA FMEA Handbook that ranks each failure mode as High, Medium or Low using severity, occurrence and detection ratings together. It tells the team where action is needed most.

What does AP mean in AIAG-VDA FMEA?

AP stands for Action Priority. It is a lookup table rating, not a calculated number, that guides whether the team must act, should act or could act on a risk.

Action Priority vs RPN: what is the difference?

RPN multiplies severity, occurrence and detection, so very different risks can get the same score. Action Priority uses a table that gives severity the most weight, so high severity items are not hidden by low occurrence.

How is Action Priority determined?

The team rates severity, occurrence and detection from 1 to 10, then looks up the combination in the AP table. The table returns High, Medium or Low for that failure mode and cause.

What does a Medium Action Priority mean?

Medium means the team should identify actions to improve prevention or detection controls, or justify and document why the current controls are adequate.

What is an Action Priority example?

A failure with severity 9, occurrence 4 and detection 6 is rated High in the AIAG-VDA table, so action is required. The same failure with occurrence 1 drops to a lower priority.

Is Action Priority used in PFMEA and DFMEA?

Yes. The AIAG-VDA Handbook uses AP tables for both design and process FMEA, and a separate table for FMEA for monitoring and system response.

Who is responsible for Action Priority decisions?

The cross-functional FMEA team assigns the ratings, and the FMEA owner makes sure High and Medium items have actions or documented reasons. Management often reviews open High items.

Put Action Priority (AP) Into Practice

Book a demo and see how OperaHive handles this on your own parts, processes and documents.