FMEA Guide: DFMEA vs PFMEA and the AIAG-VDA Method

How design and process FMEAs differ, what the seven AIAG-VDA steps ask for, and how to keep the FMEA connected to the control plan on the shop floor.

Updated 17 November 2026 · By the OperaHive team

Failure Mode and Effects Analysis (FMEA) is a structured way to find what could go wrong with a product or process, judge how serious it would be, and decide what to do about it before it happens.

In automotive, the AIAG and VDA FMEA Handbook published in 2019 brought the American and German approaches together. It introduced a seven-step method and replaced the Risk Priority Number with Action Priority.

What is FMEA?

An FMEA looks at each function of a product or each step of a process and asks three questions: how could it fail, what would the effect be, and what causes the failure. For every cause, the team records the controls that prevent it or detect it, rates the risk and assigns actions where the risk is too high.

An FMEA is a living document. It should be updated when the design or process changes, when a customer complaint reveals a failure nobody predicted, and when actions are completed.

DFMEA vs PFMEA

The two most common types look at different sources of failure.

Design FMEA (DFMEA)Process FMEA (PFMEA)
FocusHow the product design could fail to meet its functionHow the manufacturing process could fail to make the part as designed
OwnerDesign engineeringManufacturing and process engineering
Typical causesWrong material choice, tolerance stack-up, weak geometryWrong setting, worn tool, missed operation, wrong part loaded
WhenDuring product design and developmentDuring process design, before the line is built
Feeds intoDesign verification plan, special characteristicsControl plan, work instructions, error proofing

The two are linked. A special characteristic identified in the DFMEA needs a matching control in the PFMEA and the control plan. The AIAG-VDA handbook also adds a supplemental FMEA for monitoring and system response (FMEA-MSR) for systems that detect and react to faults in use.

The 7 steps of the AIAG-VDA FMEA method

  1. Planning and preparation: define the scope, the team, the timing and the tools.
  2. Structure analysis: break the product or process into its elements, such as system, subsystem and component, or process item, process step and work element.
  3. Function analysis: describe what each element must do and the requirements it must meet.
  4. Failure analysis: link failure effects, failure modes and failure causes across the structure.
  5. Risk analysis: record prevention and detection controls and rate severity, occurrence and detection.
  6. Optimization: assign actions to reduce risk, with owners and dates, and re-rate once done.
  7. Results documentation: report the outcome and the actions taken to management and, where needed, the customer.

Steps two to four are what make the method different from older FMEAs. Building the structure and the function links first makes the failure chain explicit, so the causes in a PFMEA trace back to the effects that matter to the customer.

Action Priority vs RPN

Older FMEAs multiplied severity, occurrence and detection, each rated 1 to 10, into a Risk Priority Number (RPN). The problem is that very different risks can give the same number: a severity 10 with good controls can score lower than a minor issue with poor detection.

Action Priority (AP) replaces the multiplication with a lookup table that weights severity first, then occurrence, then detection. Each failure chain gets a priority of High, Medium or Low:

  • High: action is required to improve prevention or detection, or a justification must be documented.
  • Medium: action should be taken, or the reason for no action documented.
  • Low: action could be taken.

Some customers still ask for RPN. Many teams keep both during the transition, but AP is the method the AIAG-VDA handbook expects.

From PFMEA to control plan

The control plan is where the PFMEA reaches the shop floor. Each prevention and detection control in the PFMEA should appear in the control plan with its method, sample size, frequency and reaction plan.

When the PFMEA and control plan are kept in separate files, they drift apart. A control is added to one but not the other, or a process step is renamed. Building the control plan directly from the PFMEA keeps them in step.

Common FMEA mistakes

  • Writing the FMEA after the design or process is fixed, so it cannot change anything.
  • Copying an old FMEA without reviewing what is different on the new part.
  • Listing inspection as the only control for high-severity causes.
  • Leaving actions open with no owner or due date.
  • Never updating the FMEA after customer complaints or internal failures.

FMEA software

OperaHive FMEA software follows the seven AIAG-VDA steps for DFMEA and PFMEA, calculates Action Priority or RPN, tracks every action to closure and builds the control plan directly from the PFMEA.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What is the difference between DFMEA and PFMEA?

A DFMEA looks at how the product design could fail to perform its function. A PFMEA looks at how the manufacturing process could fail to make the part as designed. The DFMEA is owned by design engineering and the PFMEA by manufacturing engineering.

What are the 7 steps of the AIAG-VDA FMEA?

The seven steps are:

  1. Planning and preparation
  2. Structure analysis
  3. Function analysis
  4. Failure analysis
  5. Risk analysis
  6. Optimization
  7. Results documentation
Is RPN still used?

The AIAG-VDA handbook replaces RPN with Action Priority. Some customers and older programs still ask for RPN, so many teams can report both.

How often should an FMEA be updated?

Update the FMEA whenever the design or process changes, after customer complaints or internal failures, and when actions are completed. Many companies also review it on a fixed schedule, such as once a year.

What is a foundation FMEA?

A foundation FMEA (sometimes called a family or generic FMEA) captures the known risks of a common product or process. New FMEAs start from it and are then adjusted for what is different on the new part.