What Is Risk Priority Number (RPN)?

Definition

Risk Priority Number (RPN) is a score used in FMEA, calculated by multiplying the severity, occurrence and detection ratings of a failure mode, to help rank which risks to work on first.

RPN in Simple Terms

Each failure mode in an FMEA gets three ratings, usually from 1 to 10. RPN multiplies them: RPN = Severity x Occurrence x Detection. Scores range from 1 to 1000, and higher numbers suggest a higher priority for action.

Limits of RPN

RPN treats the three ratings as equally important, which they are not. Very different risks can share the same score:

SeverityOccurrenceDetectionRPN
1025100
2105100

The first row could be a safety issue, the second a minor cosmetic defect. Teams also used fixed thresholds, such as "act on anything over 100", which led to rating games rather than real risk reduction.

For these reasons the AIAG-VDA FMEA Handbook (2019) replaced RPN with Action Priority, which uses tables that weigh severity first, then occurrence, then detection.

Example

In a PFMEA for a brake line crimp, "crimp too loose" has severity 9, occurrence 4 and detection 6, giving an RPN of 216. The team adds a crimp force monitor that rejects bad parts, which lowers detection to 3 and the RPN to 108. Under Action Priority, the high severity alone would still flag this item for review.

Is RPN Still Used?

Yes. Many FMEAs written to the older AIAG 4th edition still use RPN, and some industries and customers ask for it. New automotive FMEAs usually follow the AIAG-VDA method. OperaHive FMEA software works out Action Priority from your own rating tables. Read our FMEA guide for both approaches.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What is a risk priority number?

A risk priority number (RPN) is a score used in FMEA to rank failure modes. It combines ratings for severity, occurrence and detection.

What is RPN in FMEA?

In FMEA, RPN is the product of the severity, occurrence and detection ratings for a failure mode and cause. Higher numbers indicate higher risk and help decide where to act first.

How do you calculate RPN?

Multiply the severity, occurrence and detection ratings: RPN = S x O x D. With 1 to 10 scales, the result is between 1 and 1000.

What is an RPN example?

If a failure has severity 8, occurrence 4 and detection 5, the RPN is 8 x 4 x 5 = 160. After adding an error-proofing check that lowers detection to 2, the RPN drops to 64.

What is a good RPN threshold?

There is no standard threshold, and fixed cut-offs are discouraged. Always review high severity items regardless of RPN.

What replaced RPN?

The AIAG-VDA FMEA Handbook introduced Action Priority (AP), which ranks risk as high, medium or low.

RPN vs Action Priority: what is the difference?

RPN multiplies three ratings, so very different risks can get the same number. Action Priority uses a lookup table that weights severity first, then occurrence, then detection.

What are the limitations of RPN?

RPN can hide high severity risks behind low scores, treats the three ratings as equally important, and encourages teams to lower scores rather than reduce real risk.

How do you reduce RPN?

Reduce occurrence by changing the design or process, or improve detection with better controls. Severity usually only changes through a design change.

Is RPN still used?

Yes. Many companies and some customers still use RPN, especially outside automotive, though automotive suppliers moving to the AIAG-VDA method now use Action Priority.

Put Risk Priority Number (RPN) Into Practice