What Is Control Plan?

Definition

A Control Plan is a document that describes how each product and process characteristic is controlled during manufacturing: what is checked, how, how often, and what to do if it goes wrong.

Control Plan in Simple Terms

The PFMEA identifies what can go wrong in a process. The control plan turns that into daily practice on the shop floor. It is one of the AIAG core tools, a required PPAP element and a living document that changes whenever the process changes.

AIAG publishes a dedicated Control Plan reference manual, and IATF 16949 requires control plans at system, subsystem, component or material level.

Key Elements

  • Process step and machine or tool.
  • Product and process characteristics, with special characteristics marked.
  • Specification and tolerance.
  • Evaluation or measurement technique.
  • Sample size and frequency.
  • Control method, such as SPC, error-proofing or a check sheet.
  • Reaction plan if the result is out of tolerance.

Control plans are written for three phases: prototype, pre-launch and production.

Example

For a press-fit bearing operation, the control plan lists press force as a special characteristic, monitored 100 percent by a force sensor that rejects out-of-range parts, and bearing height checked with a dial gauge on 5 parts per hour and charted. The reaction plan says to stop, quarantine parts since the last good check and notify the supervisor.

Common Mistakes

  • Writing the control plan separately from the PFMEA, so they do not match.
  • Vague reaction plans such as notify quality.
  • Not updating it after a CAPA or process change.

The OperaHive FMEA software connects FMEA with control plans and APQP. Our IATF 16949 core tools guide shows how they fit together.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What are the three types of control plan?

Prototype, pre-launch and production. Each covers the controls used at that stage of the product launch.

What is the difference between a control plan and an inspection plan?

An inspection plan lists checks on the product. A control plan covers both product and process characteristics, links to the PFMEA and includes reaction plans.

What is a control plan in quality management?

A control plan is a document that lists the product and process characteristics to be controlled at each step, how they are measured, how often and what to do when something goes wrong.

What is included in a control plan?

A control plan usually includes:

  • process steps and machines
  • product and process characteristics
  • special characteristic symbols
  • specifications and tolerances
  • measurement methods and sample size and frequency
  • control methods
  • reaction plans
What is the control plan in APQP and PPAP?

The control plan is a key output of APQP and a required element of the PPAP submission. It must align with the process flow diagram and PFMEA.

How is a control plan linked to the PFMEA?

Controls listed in the PFMEA for each failure mode should appear in the control plan, and special characteristics must match. When the PFMEA changes, the control plan should be reviewed at the same time.

What is a reaction plan in a control plan?

A reaction plan tells the operator what to do when a characteristic is out of control or out of specification, such as stopping the process, quarantining parts and notifying the supervisor.

Who is responsible for the control plan?

A cross-functional team creates the control plan, usually led by manufacturing or quality engineering. Quality typically owns updates and makes sure it matches what actually happens on the shop floor.

When should a control plan be updated?

Update the control plan when the product, process, measurement method or PFMEA changes, after customer complaints or internal failures, and when audits find it does not match practice.

Is a control plan required by IATF 16949?

Yes. IATF 16949 requires control plans at system, subsystem, component or material level for the parts supplied, covering pre-launch and production, with content defined in an annex of the standard.

Put Control Plan Into Practice

Book a demo and see how OperaHive handles this on your own parts, processes and documents.