What Is Production Part Approval Process (PPAP)?

Definition

Production Part Approval Process (PPAP) is the method automotive suppliers use to prove to a customer that their production process can make parts that meet every requirement, consistently, at the quoted rate.

PPAP in Simple Terms

Before a customer accepts production parts, the supplier collects evidence from a significant production run: measurements, test results, the PFMEA, the control plan, capability and measurement studies. The package is summarised on a Part Submission Warrant.

PPAP is defined in the AIAG PPAP manual (4th edition) and is required under IATF 16949. It is the main output of phase 4 of APQP. Aerospace uses a similar approach under AS9145.

The 5 PPAP Submission Levels

LevelWhat is submitted to the customer
1Warrant only, plus appearance approval report if required
2Warrant with product samples and limited supporting data
3Warrant with product samples and complete supporting data (the usual default)
4Warrant and other requirements as defined by the customer
5Warrant with samples and complete data reviewed at the supplier site

At every level the supplier keeps all 18 elements on file. The level only decides what is sent.

Example

A supplier moves a die-cast housing to a new machine. This is a process change, so it notifies the customer and runs 300 parts. It measures five parts on every dimension, repeats the capability study on the bore, updates the PFMEA and control plan, and submits a level 3 PPAP. The customer approves before the new machine ships production parts.

When PPAP Is Required

  • A new part or product.
  • An engineering change to the design or specification.
  • A new or changed process, tooling, material or sub-supplier.
  • A move to a new site or a tool reactivated after a long break.

OperaHive PPAP software tracks each element to a decision and lets suppliers upload their own evidence. For the full process, read the PPAP guide.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What is PPAP?

PPAP, the Production Part Approval Process, is an automotive method for proving that a supplier understands the customer requirements and that its process can make conforming parts at the quoted rate.

What are the 18 elements of PPAP?

They include design records, engineering change documents, customer engineering approval, DFMEA, process flow diagram, PFMEA, control plan, MSA, dimensional results, material and performance test results, initial process studies, lab documentation, appearance approval report, sample parts, master sample, checking aids, customer-specific requirements and the PSW.

What are the 5 levels of PPAP?

Level 1 is the PSW only. Level 2 adds samples and limited data. Level 3 is the PSW, samples and full supporting data. Level 4 is the PSW plus other customer-defined requirements. Level 5 is full data reviewed at the supplier site.

What is the default PPAP level?

Level 3 is the default in the AIAG manual unless the customer specifies another level.

What is the difference between PPAP and FAI?

PPAP proves a production process is capable over a run of parts. First article inspection verifies that the first part made matches the drawing, and is more common in aerospace.

What is a PSW in PPAP?

The Part Submission Warrant (PSW) is the summary form that the supplier signs to declare that the parts meet all requirements. It is required at every PPAP level.

When is PPAP required?

PPAP is needed for a new part, a change to design, material or process, a new supplier or site, tooling moved or refurbished, or after production has been inactive for a long period.

PPAP vs APQP: what is the difference?

APQP is the planning framework used to develop a product and process. PPAP is the output at the end of APQP that shows the customer the process is ready for production.

Who is responsible for PPAP?

The supplier prepares and submits the PPAP, usually led by a quality or supplier quality engineer. The customer reviews it and grants full, interim or rejected status.

What is interim PPAP approval?

Interim approval lets a supplier ship parts for a limited time or quantity while open issues are fixed. The supplier must close the gaps and resubmit for full approval.

What is a PPAP in aerospace?

Aerospace uses a similar process under the AS9145 standard, which combines APQP and PPAP. It works alongside first article inspection to AS9102.