IATF 16949 is the quality management standard for automotive production and service parts. It builds on ISO 9001 and adds requirements that are specific to automotive suppliers.
Much of what IATF 16949 expects in practice is delivered through five methods published by AIAG and known as the core tools. Automotive customers name them in their customer-specific requirements, and auditors look for evidence of them on every new part.
The 5 automotive core tools
| Core tool | What it does | When it is used |
|---|---|---|
| APQP | Plans the product and process launch in five phases with defined deliverables | From the customer enquiry to stable production |
| FMEA | Finds design and process risks and drives actions to reduce them | During product and process design, then kept up to date |
| MSA | Proves that gauges and measurement methods are good enough | Before capability studies and whenever a gauge or method changes |
| SPC | Monitors process variation and measures capability | Initial studies at launch, then ongoing in production |
| PPAP | Packages the evidence for customer approval | At the end of launch and after significant changes |
The control plan is often listed alongside them. It is produced during APQP, built from the PFMEA and used every day in production.
APQP: Advanced Product Quality Planning
APQP is the framework that holds the other tools together. It splits a launch into five phases, plan and define, product design, process design, validation, and feedback, each with deliverables and a gate review. Read more in our APQP guide.
FMEA: Failure Mode and Effects Analysis
FMEA identifies how a design (DFMEA) or a process (PFMEA) could fail, rates the risk and assigns actions. The current method is the seven-step AIAG-VDA approach with Action Priority. Read more in our FMEA guide.
MSA: Measurement System Analysis
Every decision about a part depends on a measurement. MSA checks that the measurement system, the gauge, the method and the people using it, adds little enough variation that the result can be trusted.
- Gauge R&R: how much variation comes from the gauge (repeatability) and from different appraisers (reproducibility).
- Bias, linearity and stability: whether the gauge reads true across its range and over time.
- Attribute agreement analysis: for go or no-go checks and visual inspection.
A common guideline is that a %GRR under 10% is acceptable, 10% to 30% may be acceptable depending on the application and cost, and over 30% is not acceptable.
SPC: Statistical Process Control
SPC uses control charts to tell normal process variation apart from a real change, so the operator reacts to signals and not to noise. Capability indices such as Cpk and Ppk show whether a stable process fits inside the tolerance. Read more in our SPC and Cpk guide.
PPAP: Production Part Approval Process
PPAP is the evidence package at the end of APQP. It contains up to 18 elements, including the FMEAs, the control plan, MSA studies and capability results, summarised on a Part Submission Warrant. Read more in our PPAP guide.
How the core tools connect
The core tools are not five separate activities. Each one feeds the next:
- APQP sets the timing and owners for the launch.
- The DFMEA and PFMEA identify the risks and the special characteristics.
- The control plan defines how each characteristic is controlled and measured.
- MSA proves the gauges in the control plan can be trusted.
- SPC proves the process is stable and capable on those characteristics.
- PPAP collects all of this as evidence for customer approval.
When the tools live in separate spreadsheets, a change in one is easy to miss in the others. Auditors often find a PFMEA control that never made it into the control plan, or a capability study done on a gauge that was never studied.
What auditors look for
- FMEAs that are current and match the actual process.
- A control plan that matches the PFMEA and is used on the shop floor.
- MSA studies for the gauges named in the control plan.
- Capability data for special characteristics, with reaction plans when it drops.
- PPAP approvals for every part in production, and resubmissions after changes.
- Customer-specific requirements applied to each customer's parts.