PSW in Simple Terms
The PSW is the cover sheet of a PPAP package. It names the part, the drawing revision, the reason for submission and the submission level, and it carries a signed declaration from the supplier that the evidence is complete and the parts conform.
It is required at every PPAP submission level, including level 1, where it is often the only document sent to the customer.
What the PSW Contains
- Part number, name, drawing number and engineering change level.
- Supplier and manufacturing site details.
- Reason for submission, such as a new part, an engineering change or a new supplier site.
- Requested submission level, from 1 to 5.
- Results summary for dimensions, materials, performance and appearance.
- Part weight and material reporting status.
- The supplier declaration, signature and the customer disposition: approved, rejected or interim approval.
The full list of evidence behind the warrant is covered in our PPAP guide.
Example
A tier 2 supplier changes the steel grade on a bracket after an approved engineering change. It completes a new PSW with the reason "engineering change", lists the new drawing revision, reports the part weight, signs the declaration and submits at level 3. The customer reviews the evidence and marks the PSW as approved.
Common Mistakes
- The drawing revision on the PSW does not match the parts measured.
- The person signing has not reviewed the evidence.
- The wrong reason for submission is ticked, so the customer asks for more data.
- One PSW covers several part numbers when the customer expects one per part.
In OperaHive, the OperaHive PPAP software tracks each PPAP element to a decision so the warrant is signed against complete evidence.