NCR in Simple Terms
When an inspector finds a part out of tolerance, a wrong material or a missed process step, an NCR captures it. The suspect items are identified and held so they cannot be used by mistake, and a review decides their fate. Controlling nonconforming output is required by ISO 9001, IATF 16949 and AS9100.
How It Works
- Identify: describe the nonconformance, the requirement, the quantity and where it was found.
- Contain: tag and quarantine suspect stock, as a containment action.
- Disposition: decide to rework, repair, scrap, return to supplier or use as is. Use as is or repair usually needs engineering approval, and often customer approval through a deviation.
- Correct: if the problem is significant or repeats, raise a CAPA to remove the root cause.
- Close: record the outcome and the cost.
Example
Incoming inspection finds 120 of 2,000 machined covers with a hole 0.1 mm undersize. The inspector raises an NCR, quarantines the lot and sorts it. The 120 parts are returned to the supplier, the rest are released, and a SCAR asks the supplier for a root cause and corrective action.
Why It Matters
NCRs stop bad parts reaching the customer and create the data for trend analysis and cost of poor quality. OperaHive quality inspection software records nonconformances from inspections and follows the corrective actions.