Where-Used Analysis in Simple Terms
A normal BOM explosion goes down: start with a product and list its parts. Where-used goes up: start with a part and list everything it goes into. A single fastener or resin grade may appear in dozens of products.
When It Is Used
- Engineering changes: before approving an engineering change request, check every product the change affects.
- Supplier or material problems: find which products could contain a suspect component.
- Obsolescence: plan replacement when a part is discontinued.
- Compliance: find products affected by a restricted substance, for RoHS or REACH.
- Costing: see which products are affected by a price change.
Example
An engineer wants to change the plating on screw 50-0112. A where-used search shows it is in 3 sub-assemblies and 14 finished products, including one sold to an aerospace customer that requires approval for any change. The change request is updated to include that customer notification before release.
Why It Matters
Without where-used data, changes are approved with only part of the picture, and side effects show up later in production or at the customer. Accurate results depend on accurate BOMs, including both the engineering BOM and the manufacturing BOM. The OperaHive PLM software manages EBOMs and MBOMs with where-used impact tracking. Read more in our post on the bill of materials in manufacturing.