What Is Engineering Change Request (ECR)?

Definition

An Engineering Change Request (ECR) is a formal proposal to change a product, part, drawing, BOM or specification, describing the problem, the proposed change and its expected impact so it can be reviewed and approved.

ECR in Simple Terms

Anyone can spot a reason to change a design: a customer, a production supervisor, a supplier or a quality engineer. The ECR is how that idea enters a controlled change control process instead of being made informally. It is the first step; once approved, the change is released with an engineering change notice.

How It Works

  1. Raise: describe the problem or opportunity and the proposed change.
  2. Assess impact: affected parts, assemblies, tooling, stock, cost, timing and customer approval.
  3. Review: a change board of engineering, quality, production and purchasing discusses it.
  4. Decide: approve, reject or send back for more information.
  5. Release: approved changes move to an ECN.

A where-used analysis is a key part of impact assessment, because one part may appear in many assemblies.

Example

Assembly operators report that a cover screw is hard to reach. A manufacturing engineer raises an ECR to move the screw boss 5 mm. Impact review shows a tooling change, a DFMEA update and a customer notification. The board approves it, and an ECN releases the new drawing revision.

Common Mistakes

  • Skipping the impact check on stock, tooling and other assemblies.
  • Approving changes without updating FMEAs and control plans.
  • Forgetting customer notification where it is required.

OperaHive engineering change management manages change requests, approvals and impact reviews across parts, documents and production orders.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What is the difference between an ECR and an ECN?

An ECR proposes a change and asks for approval. An ECN releases the change after it has been approved.

Who can raise an ECR?

In most companies anyone can raise one, including production, quality, purchasing, suppliers or customers, but engineering and a change board decide on it.

What is an engineering change request (ECR)?

An engineering change request is a formal document that proposes a change to a product design, drawing, specification or process. It records what should change, why, and the expected impact so the change can be reviewed before any work starts.

What is the full form of ECR in manufacturing?

ECR stands for engineering change request. It is the first step in the engineering change process, followed by evaluation, approval and release through an engineering change notice (ECN) or order (ECO).

What is the difference between an ECR and an ECO?

An ECR asks whether a change should be made. An ECO (engineering change order) is the instruction to carry out an approved change, listing the affected parts, documents and effective dates.

What should an engineering change request include?

A complete ECR usually includes:

  • Part numbers and drawings affected
  • Description of the proposed change
  • Reason or problem being solved
  • Impact on cost, tooling, stock and suppliers
  • Proposed effectivity and urgency
What is the ECR process step by step?

The requester raises the ECR, engineering assesses feasibility, affected teams review cost, quality and supply impact, and a change control board approves or rejects it. Approved changes move to an ECN or ECO for release and implementation.

How long should an ECR take to approve?

Simple ECRs are often decided within a few days, while complex changes affecting tooling, suppliers or customer approval can take weeks. Tracking cycle time per ECR helps spot bottlenecks in the review stage.

Do engineering change requests need customer approval in automotive?

Often yes. Under IATF 16949 and PPAP rules, changes to product or process usually must be notified to the customer, and many require a new PPAP submission before the changed part can ship.

What are common ECR mistakes?

Typical mistakes include vague change descriptions, missing impact analysis, approving changes by email without a record, and failing to update drawings, BOMs and work instructions after approval.

What software is used to manage engineering change requests?

ECRs are managed in PLM, ERP or dedicated quality and engineering systems that route requests for review, keep approval history and link changes to drawings and BOMs. In OperaHive, an approved ECR leads to a linked ECN that manages implementation.