What Is Bill of Materials (BOM)?

Definition

A Bill of Materials (BOM) is the structured list of every part, sub-assembly and raw material, with quantities, needed to make a product. It is the recipe that engineering, purchasing and production all work from.

Bill of Materials in Simple Terms

A BOM tells you what goes into a product and how much of it. A simple single-level BOM lists only the direct components. A multi-level BOM shows the full tree: a finished assembly, its sub-assemblies, and the parts inside each of those.

Most companies keep more than one view. The engineering BOM reflects the design, and the manufacturing BOM reflects how the product is actually built, including packaging and consumables.

Key Elements

FieldPurpose
Part number and revisionIdentifies exactly which item and version
DescriptionPlain name of the item
Quantity perHow many are used in one parent
Unit of measureEach, kg, metre and so on
LevelPosition in the product structure
Make or buyWhether it is produced or purchased

Example

An electric pump assembly has a top-level BOM with a motor sub-assembly, an impeller, a housing, four M6 screws and a seal kit. The motor sub-assembly has its own BOM of stator, rotor and bearings. When MRP plans 200 pumps, it explodes the BOM and calculates that 800 screws and 400 bearings are needed.

Common Mistakes

  • Engineering and production keeping separate, unsynchronised BOM spreadsheets.
  • Changing a component without change control or a where-used check.
  • Missing revisions, so the wrong version is bought.

OperaHive PLM software manages parts, revisions, EBOMs and MBOMs with engineering change control. Read more in our post on the bill of materials in manufacturing.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What is the difference between an EBOM and an MBOM?

The EBOM shows the product as designed by engineering. The MBOM shows how it is built on the shop floor, including process-specific items such as packaging, adhesives and sub-assemblies used for production.

Who owns the BOM?

Engineering usually owns the EBOM and manufacturing engineering owns the MBOM, with changes controlled through an engineering change process.

What is a bill of materials?

A bill of materials, or BOM, is a structured list of all the parts, raw materials and sub-assemblies, with quantities, needed to make a product.

What is the full form of BOM?

BOM stands for bill of materials. In engineering and manufacturing it is the master list of everything that goes into a product.

What should a BOM include?

A typical BOM includes:

  • Part number and description
  • Quantity per assembly
  • Unit of measure
  • Revision
  • Level in the structure
  • Supplier or make or buy status
What are the types of BOM?

Common types are the engineering BOM, manufacturing BOM, service BOM and sales or configurable BOM. They may also be single level or multi level.

What is a multi-level BOM?

A multi-level BOM shows the full parent and child structure, so sub-assemblies are listed with their own components under them.

What is a BOM example?

A bicycle BOM lists the frame, two wheels, handlebar and saddle at the top level, with each wheel broken down into rim, spokes, hub and tyre.

Why is BOM accuracy important?

Errors in the BOM lead to wrong parts purchased, build mistakes, shortages and wrong costs. Many plants aim for BOM accuracy close to 100 percent.

How is a BOM used in quality and traceability?

The BOM links each finished product to its components, so quality can trace lots, assess the effect of a supplier problem and control changes.

Put Bill of Materials (BOM) Into Practice

Book a demo and see how OperaHive handles this on your own parts, processes and documents.