Bill of Materials in Simple Terms
A BOM tells you what goes into a product and how much of it. A simple single-level BOM lists only the direct components. A multi-level BOM shows the full tree: a finished assembly, its sub-assemblies, and the parts inside each of those.
Most companies keep more than one view. The engineering BOM reflects the design, and the manufacturing BOM reflects how the product is actually built, including packaging and consumables.
Key Elements
| Field | Purpose |
|---|---|
| Part number and revision | Identifies exactly which item and version |
| Description | Plain name of the item |
| Quantity per | How many are used in one parent |
| Unit of measure | Each, kg, metre and so on |
| Level | Position in the product structure |
| Make or buy | Whether it is produced or purchased |
Example
An electric pump assembly has a top-level BOM with a motor sub-assembly, an impeller, a housing, four M6 screws and a seal kit. The motor sub-assembly has its own BOM of stator, rotor and bearings. When MRP plans 200 pumps, it explodes the BOM and calculates that 800 screws and 400 bearings are needed.
Common Mistakes
- Engineering and production keeping separate, unsynchronised BOM spreadsheets.
- Changing a component without change control or a where-used check.
- Missing revisions, so the wrong version is bought.
OperaHive PLM software manages parts, revisions, EBOMs and MBOMs with engineering change control. Read more in our post on the bill of materials in manufacturing.