Kaizen in Simple Terms
Kaizen assumes that every process can be improved a little, every day. Rather than waiting for a large project, operators, engineers and supervisors spot waste, try a fix and keep what works. It is a core habit in lean manufacturing and in TPM.
How It Works
Most kaizen follows the Plan, Do, Check, Act (PDCA) cycle:
- Plan: describe the problem, measure the current state and propose a change.
- Do: try the change on a small scale.
- Check: measure the result against the baseline.
- Act: make the change standard, for example in a work instruction, or try again.
Kaizen takes two common forms: daily suggestions from the shop floor, and focused kaizen events where a small team spends a few days improving one area.
Example
An assembly cell spends 22 minutes on each changeover, mostly hunting for fixtures and bolts. In a three-day kaizen event the team builds a shadow board, pre-stages the next fixture on a cart and swaps bolts for quick clamps. Changeover drops to 9 minutes and the new steps go into the standard work sheet.
Common Mistakes
- Running events with no follow-up, so the area slides back.
- Skipping the measurement, so no one knows if the change worked.
- Treating kaizen as a quality department job rather than everyone's habit.
Improvement ideas from breakdowns and operator checks can be tracked in OperaHive TPM software.