FAI in Simple Terms
FAI measures and checks every characteristic on the drawing, not just a sample of key dimensions. It proves that the production process, tooling and materials can make a conforming part. In aerospace, FAI is usually documented to SAE AS9102, and it is part of the requirements of AS9100 suppliers.
Key Elements
AS9102 uses three forms:
- Form 1, part number accountability: identifies the part and any sub-assemblies.
- Form 2, product accountability: materials, special processes and functional tests, with supplier and certificate references.
- Form 3, characteristic accountability: each drawing characteristic, often numbered on a ballooned drawing, with its requirement and the actual result.
A new FAI, or a partial FAI covering the affected characteristics, is normally needed after a design change, a change in manufacturing source, process or location, or a long break in production.
Example
A machine shop starts making an aluminium bracket for an aircraft interior. It balloons 64 characteristics on the drawing, measures each on the first production part, attaches the material certificate and anodising certificate on Form 2, and submits the FAI report to the customer before shipping the first lot.
FAI vs PPAP
FAI is the aerospace approach; automotive uses PPAP, which includes a dimensional report plus capability studies, MSA and a control plan. AS9145 brings PPAP-style approval into aerospace. OperaHive quality inspection software manages incoming, in-process and final inspections.