What Is Design Verification Plan and Report (DVP&R)?

Definition

Design Verification Plan and Report (DVP&R) is a document that lists every test needed to prove a product design meets its requirements, and then records the results of those tests.

DVP&R in Simple Terms

The DVP&R is a test plan and a results sheet in one. The plan half says what will be tested, how, to what acceptance criteria, how many samples, and when. The report half records whether each test passed. It is a common output of phase 2 of APQP and is often included in a PPAP submission as design verification evidence.

Many tests in the DVP&R come straight from the DFMEA, where they appear as detection controls.

Key Elements

  • Test name and the requirement or specification it verifies.
  • Test method and acceptance criteria.
  • Sample size and build level (prototype or production intent).
  • Responsible person and test facility.
  • Planned and actual dates.
  • Result: pass, fail or open, with a report reference.

Example

For a new door handle, the DVP&R lists a pull strength test, a 50,000 cycle durability test, a salt spray corrosion test and a cold temperature impact test. The cold test fails at first, the design is updated, and the DVP&R records the retest and the final pass.

Why It Matters

Without a DVP&R, testing is planned informally and gaps show up late. A complete plan proves to the customer that every requirement was checked. It is part of verification and validation work. OperaHive APQP software tracks APQP deliverables and gate reviews by phase.

FAQ

Frequently Asked Questions

Still unsure? Ask our team.

What does DVP&R stand for?

DVP&R stands for Design Verification Plan and Report.

Is DVP&R part of PPAP?

Design verification evidence is part of PPAP when the supplier is design responsible, and a DVP&R is a common way to provide it.

What is DVP&R in automotive?

In automotive, DVP&R is the document that lists every test needed to verify a design meets its requirements, then records the results. It is used during APQP and supports PPAP.

What is included in a DVP&R?

A DVP&R typically includes:

  • the test or analysis name
  • the requirement or specification
  • acceptance criteria
  • sample size and test stage
  • responsible person and timing
  • results and pass or fail status
Who is responsible for the DVP&R?

The design responsible party, usually the product engineering team, owns the DVP&R. Test labs, suppliers and quality provide the testing and results.

When is a DVP&R created?

Start the DVP&R during design development, once the requirements and DFMEA are available, and complete it before design release and production approval.

How is DVP&R linked to the DFMEA?

Detection controls in the DFMEA should appear as tests in the DVP&R. Results from the tests then confirm or update the DFMEA ratings.

What is the difference between design verification and validation?

Verification checks that the design meets its specified requirements. Validation checks that the product meets the customer needs in its real use.

What happens if a DVP&R test fails?

Record the failure, investigate the root cause, change the design or test conditions as needed and repeat the test. Failures and actions should be tracked to closure before release.

Is there a DVP&R template?

Many OEMs provide their own DVP&R format, and AIAG reference materials include an example layout. Most templates are a table of tests, criteria, timing and results.

What are common DVP&R mistakes?

Common mistakes include tests that do not trace back to requirements, missing sample sizes, reporting results without acceptance criteria and failing to update the DVP&R after design changes.

Put It Into Practice