Bottleneck in Simple Terms
A line can only ship as fast as its slowest step. If machining produces 60 parts an hour but heat treatment handles 45, the line ships 45 an hour no matter how fast machining runs. Extra capacity elsewhere just builds work in progress in front of the constraint.
How to Find It
- Look for the largest pile of work in progress waiting in front of a step.
- Compare each step capacity with demand. The lowest one is the constraint.
- Check which machine is never starved and rarely idle.
- Watch where expediters spend their time.
A bottleneck can move. Fix one and the next slowest step becomes the constraint, and changes in product mix can shift it too.
Example
A sheet metal plant ships late every week. Lasers and press brakes have spare hours, but the single powder coat line runs flat out, and long colour changes cost two hours a day. Grouping jobs by colour and moving masking off the line raises coating output by 15 percent, and on-time delivery improves without buying a new machine.
How to Improve a Bottleneck
- Make sure it never waits for material, operators or set-ups.
- Protect its uptime with preventive maintenance and track its OEE and downtime.
- Inspect before the bottleneck so it does not process scrap.
- Offload work to other resources where possible.
- Add capacity only after the first four steps.