One Part Number, Six Spreadsheets, and Nobody Sure Which One Is Current
Take a single bracket. It has a launch plan, a PPAP, a control plan, SPC checks on two dimensions, a progressive die and a weekly delivery schedule. In most plants, each of those lives with a different person in a different file.
That works until something changes. A drawing revision comes in, or a customer complaint lands, and it takes two days of phone calls to work out which batches, which die and which control plan are affected.
OperaHive keeps all of it attached to the part. When something changes, you can see what it touches before it reaches the line.